Threads / HS2 Phase 2a Development / HS2 Phase 2b information papers: Construction (D Series)
Policy Paper Published 3 Jul 2023 High Speed Two (HS2) Limited ↗ View on GOV.UK

HS2 Phase 2b information papers: Construction (D Series)

An outline of the construction methods, design, security and timetable for HS2 Phase 2b (Crewe – Manchester) route.

Attachments
▤ Verbatim text from source document

The documents contained in Series D of our information papers describe:

  • the design development process prior to construction
  • interactions with local planning authorities and consultation with affected communities
  • controls on construction activities outlined in the Code of Construction Practice, including working hours
  • the construction timetable for Phase 2b (Crewe – Manchester); an overview of the main stages and a timeline
  • the use of borrow pits for construction
  • how access to property (due to temporary interference with the highway) will be maintained during construction works
  • mitigation for risks of disruption to public utilities during construction

If you experience any problems, please contact the HS2 helpdesk:

HS2 helpdesk High Speed Two (HS2) Ltd Two Snowhill Snow Hill Queensway Birmingham B4 6GA

Email HS2enquiries@hs2.org.uk

Freephone 08081 434 434

Minicom 08081 456 472