Threads / HS2 Phase 2a Development / HS2 Phase 2b SES1 and AP1 ES Wider effects report (CT-006-0…
Impact Assessment Published 6 Jul 2022 High Speed Two (HS2) Limited ↗ View on GOV.UK

HS2 Phase 2b SES1 and AP1 ES Wider effects report (CT-006-00000)

This report details the changes to the likely significant effects reported in SES1 and AP1 ES that may result if the scheme as built deviates from the centre line of the works within the limits of deviation, as permitted under parliamentary powers.

▤ Verbatim text from source document

This report details the changes to the likely significant effects reported in SES1 and AP1 ES that may result if the scheme as built deviates from the centre line of the works within the limits of deviation, as permitted under parliamentary powers.