Threads / HS2 Phase 2a Development / HS2 Phase 2b SES1 and AP1 ES Non-technical summary
Impact Assessment Published 6 Jul 2022 High Speed Two (HS2) Limited ↗ View on GOV.UK

HS2 Phase 2b SES1 and AP1 ES Non-technical summary

This document is a summary in non-technical language of the changes reported in the SES1 and amendments reported in the AP1 ES. It presents a summary of any likely residual significant effects on the environment, which are new or different to those reported in the main ES submitted to Parliament in January 2022 in support of the hybrid Bill for High Speed Rail (Crewe – Manchester).

Attachments
▤ Verbatim text from source document

This document is a summary in non-technical language of the changes reported in the SES1 and amendments reported in the AP1 ES. It presents a summary of any likely residual significant effects on the environment, which are new or different to those reported in the main ES submitted to Parliament in January 2022 in support of the hybrid Bill for High Speed Rail (Crewe – Manchester).