Data centres: planning policy, sustainability, and resilience

Type: Commons Briefing Paper (CBP-10315) This briefing provides an overview of data centres, including their economic impact, energy consumption, and water consumption. It describes UK Government policy in these areas, as well as cyber resilience and planning policy.

Attachments
▤ Verbatim text from source document

Data centresplanning policy, sustainability, and resilience - House of Commons Library

Skip to main content

Documents to download

Data centresplanning policy, sustainability, and resilience
(1 MB
, PDF)

Download full report

Download ‘Data centresplanning policy, sustainability, and resilience’ report (1 MB
, PDF)

Data centres are warehouse-like facilities that house the information technology (IT) equipment upon which almost all digital activity relies. The UK Government says that they “
underpin almost all economic activity and innovation
, including the development of AI [artificial intelligence] and other technology, public service delivery, and how we interact with one another”.

In September 2024,
the UK Government designated data centres as part of the country’s critical national infrastructure
.

The UK data centre sector

Data centres can be categorised by their use and ownership:

Enterprise data centresowned and operated by a single organisation for internal purposes.

Co-location data centresthe facility is operated by a third party that rents space to customers.

Hyperscale data centresmassive facilities built by major cloud providers like Amazon, Microsoft and Google.

AI data centresfacilities specialised for the high-performance computing needs of AI development.

A data centre’s capacity is usually expressed as the maximum power it can draw, which determines how much IT equipment it can support. The UK had approximately
1.6 gigawatts (GW) of data centre capacity in 2024
.

Most UK data centres are concentrated in Greater London, which is
Europe’s largest data centre market
. However,
new hubs are emerging
in places such as Manchester and South Wales.

Economic impact

As data centres do not have an industrial classification in the UK, it is difficult to identify their economic impact. techUK estimates that UK data centres have an
annual gross value added (GVA) of £4.7 billion
. This is based on an average from a range of international studies.

Data centres also support other sectors that benefit from data processing and storage services, including AI, cloud computing, and financial services.

Data centres are highly automated facilities and the number of jobs they create is relatively modes, particularly given their size and cost. A £10 billion campus in Blyth, Northumberland, which could house up to 10 data centres, is expected to
directly create 400 full time on-site jobs
.

Why have data centres in the UK?

Preliminary analysis for the government found that
UK data centre capacity could rise to between 3.3 GW and 6.3 GW by 2030
, depending on policy interventions, but that this may not be enough to meet demand.

Although data can in principle be stored and accessed from anywhere in the world, there are several reasons for expanding data centre capacity within the UK, including:

to make it
easier for UK organisations to access high-quality data processing power
, enabling them to conduct research and develop new products and services.

to support the deployment of AI technologies: data needs to be
processed close to the user
for AI applications that require real-time decision-making, such as autonomous vehicles or remote healthcare. The government sees data centres as a key part of its
proposed AI Growth Zones
(AIGZs), through which it aims to establish AI innovation hubs across the UK.

to allow the UK Government to regulate data centres, such as by requiring them to meet cybersecurity standards and reduce their environmental impact.

Policy issues for data centres

Planning policy

Following December 2024 reforms to the government’s
National Planning Policy Framework
, which applies in England only, local authorities are required to consider the need for data centres when setting local policies and deciding planning applications. This
change was welcomed by industry stakeholders
, who had previously faced challenges getting approval for new developments. Additionally, AIGZs will have fast-track planning and infrastructure support for AI data centres.

Data centres will also be able to
opt into the Nationally Significant Infrastructure Projects (NSIP) regime
. NSIP applications are
determined by the Secretary of State
, rather than local planning authorities.

Planning policy in Scotland
[PDF] is supportive of data centres that utilise renewable energy produced in Scotland. Data centres are not mentioned in planning policy in Wales or Northern Ireland.

Energy consumption

Data centres currently
consume around 2.5% of the UK’s electricity
. The sector’s electricity consumption s expected to
rise four-fold by 2030
.

This has led to
concerns about the sustainability
of data centres. Major data centre operators have committed to
achieving voluntary sustainability targets
by 2030. They support renewables projects through power purchase agreements (PPAs), although
some studies have questioned whether PPAs contribute to decarbonisation
. Data centre operators are also exploring nuclear power, including small modular reactors, as a source of clean, reliable power.

Industry stakeholders and commentators have pointed to
high energy price and grid capacity constraints as factors limiting the growth
of the UK data centre sector. The Social Market Foundation, a think tank, has found that
powering a data centre in the UK is more expensive than in other European markets
, and four times more expensive than in the United States. This has led to calls for data centres to be included in energy-intensive industry support schemes and for reforms to electricity pricing.

Limited grid capacity means it can take years to get permission to connect to the national grid. The government has tried to improve the situation by
reforming the connections process and prioritising strategically significant projects
.

Water consumption

Cooling is essential to data centre operations, as they generate heat, and many facilities use water for cooling. Depending on the size and the cooling method used,
data centres can consume large quantities of water
.

Industry groups argue 
that water consumption is much lower in the UK than in the US
, because UK data centres 
tend not to use water-intensive cooling methods
. However, environmental campaigners have
criticised the lack of transparency
regarding water consumption.

Resilience

As data centres become more critical, their resilience to cyberattacks, power outages and climate risks is increasingly important. techUK argues that
data centres designed in accordance with international standards are highly resilient
.

The government has taken steps to enhance resilience by designating data centres as critical national infrastructure and proposing
new cybersecurity standards under the forthcoming Cyber Resilience Bill
.

Share this

Share this with

Facebook
Share this with Facebook

Twitter
Share this with Twitter

LinkedIn
Share this with LinkedIn

Email
Share this with Email

Close share panel

×

Documents to download

Data centresplanning policy, sustainability, and resilience
(1 MB
, PDF)

Download full report

Download ‘Data centresplanning policy, sustainability, and resilience’ report (1 MB
, PDF)

Related posts

TV licence fee statistics

This briefing provides statistics on the TV licence fee and general television viewing trends. TV licence fee revenues in 2024/25 were £3.84 billion. Total BBC income in 2024/25 was £5.90 billion. TV licence fee revenues accounted for around 65% of total income.

Press and media
Technology

Economic updateHow resilient are current supply chains?

Economic effects of the US/Israeli conflict with Iran are emerging for UK consumers and businesses. However, flexible supply chains may cushion price pressures.

Economic situation
Economy
Energy
International trade

Debate on water quality in Kent

A debate has been scheduled in Westminster Hall on 29 April 2026 to consider water quality in Kent. The debate will be opened by Tony Vaughan MP.

Environment