Threads / HS2 Phase 2a Development / Volume 2 MA07: Davenport Green to Ardwick
Impact Assessment Published 24 Jan 2022 High Speed Two (HS2) Limited ↗ View on GOV.UK

Volume 2 MA07: Davenport Green to Ardwick

Presents the likely significant effects of the construction and operation of High Speed Two, Phase 2b Crewe – Manchester on the environment within MA07.

Attachments
▤ Verbatim text from source document

Presents the likely significant effects of the construction and operation of High Speed Two, Phase 2b Crewe – Manchester on the environment within MA07.