Threads / HS2 Phase 2a Development / Non-technical Summary for the HS2 Phase 2b working draft En…
Impact Assessment Published 11 Oct 2018 High Speed Two (HS2) Limited ↗ View on GOV.UK

Non-technical Summary for the HS2 Phase 2b working draft Environmental Statement

A summary of the HS2 Phase 2b working draft Environmental Statement in non-technical language.

▤ Verbatim text from source document

Provides a summary in non-technical language of the Proposed Scheme and reasonable alternatives considered. This includes the impacts of the Proposed Scheme (and, where possible, the likely significant environmental effects), both beneficial and adverse; and the proposed means of avoiding, reducing or managing the likely significant adverse effects.

Published as part of the HS2 Phase 2b working draft Environmental Statement.