Network Rail system operator: developing a regulatory settlement
Seeks views on aspects of the Network Rail national system operator (NSO) settlement.
Opened
17 Nov 2016
Closed
11 Jan 2017
▤ Verbatim text from source document
The Office of Rail and Road (ORR) is seeking feedback on aspects of the Network Rail national system operator (NSO) regulatory settlement for railway control period 6 (CP6).