Threads / Smart Metering Policy Framework Post 2025 / Smart meters: proposals on non-gateway interfaces
Consultation Outcome Published 14 Sep 2015 Department for Business, Energy & Industrial Strategy ↗ View on GOV.UK

Smart meters: proposals on non-gateway interfaces

We're seeking views on a proposal that a Non-Gateway Interface (NGI) should no longer be built to support circumstances of user supplier to non-user supplier churn.

Opened 14 Sep 2015
Closed 5 Oct 2015
Attachments
▤ Verbatim text from source document

The government is seeking views on its proposal that the Data Communications Company (DCC) should no longer be required to provide a Non-Gateway Interface (NGI) to allow a non DCC User supplier(s) to update the Smart Metering Key Infrastructure certificates on a DCC enrolled SMETS2 Metering System in the event that it gains a customer with that Smart Metering System in light of recent policy and operational developments.