Reservoir safety emergency on-site flood plans consultation
Introduction In a written statement to Parliament on 16 March 2020 the Secretary of State for Environment, Food and Rural Affairs stated that the government would consult on making a requirement for all large raised reservoirs (registered reservoirs) to have an emergency contingency plan (also known as an on-site flood plan) in place. The government considers such plans essential for maintaining public safety, and is considering making the requirement for such plans a legal obligation in England. This consultation covers England only. On-site flood plans are designed to manage any risk posed that may result in an uncontrolled release of water from a reservoir that would, or might, cause flooding to the surrounding area and communities. Plans should include information on key contacts and the actions the reservoir undertaker (owner or operator), or their staff, would take on site to prevent, control or mitigate such a release. Plans should be informed by Res