The Government and Ofgem must implement in full the changes proposed in the Connections Action Plan. This must entail, for example, the prioritisation of short- term grid requirements, so as to incentivise network operators to prioritise renewable energy connections. The connection of grid inputs from solar and wind, generation, and outputs serving decarbonised applications such as heat pumps and electric vehicle charging, must be prioritised in parallel with connections for larger nuclear an...
The Government and Ofgem must implement in full the changes proposed in the Connections Action Plan. This must entail, for example, the prioritisation of short- term grid requirements, so as to incentivise network operators to prioritise renewable energy connections. The connection of grid inputs from solar and wind, generation, and outputs serving decarbonised applications such as heat pumps and electric vehicle charging, must be prioritised in parallel with connections for larger nuclear and carbon-emitting technologies. (Paragraph 93) 46 Enabling sustainable electrification of the economy Type: conclusion | Number: 20 | Response status: under_consideration Government response: As was proposed by former Electricity Networks Commissioner Nick Winser in his independent report13, an overarching national (GB-wide) public awareness campaign is planned for launch early in 2025. This campaign is being developed by the Electricity Networks Association and Transmission Owners and i