Build a thread

Build a new policy thread two ways: One-shot drops you straight on a populated workspace — pick seeds and/or describe the topic, we generate the rest. Curated shows you the candidates first so you can refine before saving.

Max 1000 chars. Either this or seeds (or both) is required.
documentDESNZ recognised that the cost of running heat pumps was also a key barrier to heat pump adoption. It explained that, as they are based on electricity, heat pumps are more expensive to run than fossil fuel boilers because of the cost of electricity is higher than gas.17 This view was supported by written evidence to our inquiry from some energy suppliers including Good Energy and Octopus Energy; a consumer campaign group, Fuel Poverty Action; and Energy UK.18 In their written evidence, the He... Written Evidence
Pick up to 8 items. Existing thread events are imported; bills and documents are re-parented.
Starting the build…
Real builds take 3–7 minutes (longer on busy topics). The chip in the corner will follow you and let you know when the thread is ready — you can navigate away.
A short phrase or full title — both work. Be specific where you can.
Start with official sources; widen if the thread is mostly news-driven.
Searching Policy Threads and the public web…
This usually takes 20–60 seconds. Please don’t close the tab — you’ll be redirected to the candidate inbox as soon as the first results arrive.